Triple M Method - Master Builder Checklist

🏗️ ATTENTION: W-2 Employees, Wholesalers & Fix-N-Flippers Ready To Build New Construction

TRIPLE M METHOD
Money Making Mindset
Free Download — The Exact Checklist Used On $13M+ In Builds

The Master Builder Checklist That Shows You Every Step To Find, Fund & Manage Your First New Construction Deal

Download the same step-by-step project checklist Abram Mitchell uses to manage every single build from pre-construction all the way to final inspection — so you never miss a critical step or lose money on hidden mistakes.

TRIPLE M METHOD

Master Project Checklist
Pre-Construction
Foundation
Framing & Roof
Rough Ins (MEP)
Exterior
Interior Finish
Punchlist & Close
Excel Spreadsheet • Instant Download

Here's What You'll Get Inside This Free Checklist:

  • The Complete Build Timeline — Every phase from pre-construction through punchlist mapped out in order so you always know what comes next
  • The "Money Mistakes" Safeguards — Critical checkpoints that prevent the $50K-$150K mistakes most first-time builders make on foundation, framing, and rough-ins
  • Bid Tracking & Estimates Manager — Compare up to 3 bids for every trade (excavation, plumbing, electric, HVAC, roofing & more) in one organized view
  • Important Documents Tracker — Never scramble for site plans, permits, draw sheets, or builder's risk insurance — every doc organized and accounted for
  • The Full Project Lifecycle — Pre-construction → Foundation → Framing → Rough Ins → Exterior → Interior → Punchlist → Final Inspections, all with status tracking and deadlines
Instant Access • 100% Free

Get Your Free Master Builder Checklist

Enter your info below and we'll send the checklist straight to your inbox.

Your info is 100% secure. We'll never spam you.
R
L
C
K
Join 400+ builders already using this system

Every Phase Of Your Build, Organized & Tracked

Pre-Construction Phase

Survey, architectural plans, permitting, utility setup, takeoffs, and everything to handle before you break ground.

Foundation & Framing

Footers, block work, waterproofing, lumber delivery, framing accuracy checks, windows, and roof — every step tracked.

Bid & Estimates Tracker

Compare 3 bids per trade — excavation, lumber, plumbing, electric, HVAC, roofing, siding, drywall, cabinets, and more.

Rough Ins & Inspections

Plumbing, electrical, HVAC rough-ins, insulation prep, framing inspection, fireblocks — nothing slips through the cracks.

Interior & Exterior Finish

Flooring, cabinets, trim, paint, countertops, appliances, brick, siding, landscaping, driveway — the full finish-out sequence.

Punchlist & Final Close

Internal inspection, appliance testing, blue tape repairs, final clean, final inspections, and U&O — cross the finish line right.

Abram Mitchell

Abram Mitchell

Founder, Triple M Method

Abram built a $13M+ real estate portfolio in Nashville before age 26 through new construction — without using his own money. He's completed over 250 transactions totaling more than $100M in sales volume and helped 400+ students learn the same system to find, fund, and manage their first (or next) new build. This checklist is pulled directly from the process he uses on every single deal.

$13M+
Portfolio
400+
Students
250+
Transactions
$100M+
Sales Volume

Stop Guessing. Start Building.

Download the free Master Builder Checklist and know exactly what to do at every stage of your build.

Instant Access • 100% Free

Get Your Free Master Builder Checklist

Enter your info and we'll send it straight to your inbox.